Hydraulic Rod Cutter

Model No.: HRC-30LV

PPT Hydraulic Rod Cutter HRC-30LV – 30 mm Capacity, Heavy Duty Industrial Tool with V-Blades.

Description

The PPT Hydraulic Rod Cutter HRC-30LV is designed for heavy-duty rod cutting in steel industries, offering precision, durability, and long service life. Built with a forged alloy steel heat-treated “C” frame and special heat-treated blades, it delivers up to 35,347 Kgf cutting force. Lightweight yet powerful, it supports bunch cutting from wire rod coils, ensuring easy operation and low maintenance. This cutter is suitable to cut the the Front and Back end rings from the Wire Rod Coil at WRM and also for sample cutting for Q.C. Lab at WRM & Bar Mill.

Features:

  • Forged alloy steel heat treated “C” frame type cylinder body used.
  • Single return spring design.
  • Special quality sealing for specified pressure.
  • High wear resistant Moving Blade guide square bushing for accurate Blade alignment.
  • Easy to operate & maintain.
  • Lighter in weight than Cast Steel design.
  • Unique design of Blades and special steel & Special Heat Treatment process used for longer life.
  • Wide range of Hydraulic Power Pack used for different application of the user requirement.
  • Single piece ram & piston design for easy maintenance.
  • Suitable tool hanger fitted to positioning the tool at any angle for easy to operate.
  • Suitable for Bunch Cutting Operation.

Specification:

Model No. Weight Length Width Height
lb kg inch mm inch mm inch mm
HRC-30LV 70.4 32 17.7 450 6.3 160 7.5 190

Model No. Dia. Capacity (mm) Tensile Strength (kg/mm2) Shear Strength (kg/mm2) Cutting Force reqd. (kgf) Cutting force generated by Cutter (kgf) @450bar W.P. x 6.0lpm
HRC-30LV 30 70 45.5 32166 35347
25 90 58.5 28720
22 110 71.5 27183
20 110 71.5 22465

Note:

  • Considering shear strength to be 65% of tensile strength.
  • If you send us the specification (Tensile strength and diameter of Bar) we shall recommend the right cutter for your application.
Index No. Part Number Part Name Qty.
1 HRCWC0001F LONG NIPPLE 1
2 HRC30LV02F CYLINDER 1
3 HRC30LV03F ROD CUTTER BODY 1
4 HRC30LV04F PISTON 1
5 HRCWC0005B HEX. NIPPLE 1
6 HRC30LC06B U-CUP SEAL 1
7 HRC30LC07B BEARING SEAT 1
8 HRC30LC08B C-PIN-1 1
8A HRC30LC8AB C-PIN-2 1
9 HRCWC0009F CONNECTOR 1
10 HRC30LV10F MOVING BLADE 1
11 HRC30LC11F BUSH 1
12 HRC30LC12B GRUB SCREW 2
13 HRC30LV13F FIXED BLADE 1
14 HRC30LV14B BOLT FOR FIXED BLADE 1
15 HRC30LV15F FIXED BLADE SUPPORT 1
16 HRC30LV16F UPPER COVER FOR FIXED BLADE 1
17 HRC30LC17B BOLTS FOR UPPER COVER 4
18 HRC30LV18B SPRING 1
19 HRCWC0019F HANDLE 1
20 HRCWC0020B GRUB SCREW FOR HANDLE 2
21 HRC30LC21B BOLT FOR HANGING RING LOCATING 2
22 HRC30LV22F HANGING RING 1
23 HRC30LC23B HANGING RING BOLT 2

OPERATIONAL MANUAL:

  • Connect the control panel with the power supply.
  • Turn on the MCB located on the control panel.
  • Make sure the Red, Blue and Yellow Lights are turned on/ Glowing.
  • Switch on the Motor and the Solenoid in Control Panel.
  • Place the Rod Securely between the Moving and Fixed Blade and make sure the Rod is aligning with the Cutting edge of the Blades and Ensure that the Full Diameter of rod is within the height of the Blades.
  • Operate the Hand/Foot Switch to cut the Rod Completely and wait for the retraction of the Moving Blade. After retraction the machine is ready for the next cut.

MAINTENANCE:

DAILY INSPECTION:
  • Perform a daily visual inspection for any signs of wear, damage, or leaks.
  • Examine hydraulic hoses and connections for any wear or damage.
  • Check and tighten all bolts and fasteners.
  • Lubricate all moving parts before operating the machine.
  • Clean travel area of the Moving Blade.
WEEKLY INSPECTION:
  • Inspect for any hydraulic fluid leaks.
  • Clean the machine to prevent dust and debris build-up.
MONTHLY INSPECTION:
  • Inspect critical components for signs of wear and replace if necessary.
  • Maintain a log of all maintenance activities.
  • Check the Oil Levels.
QUARTERLY INSPECTION:
  • Conduct a thorough inspection of the entire system.
  • Replace any worn-out components.
  • Clean the Strainers fitted with the Pump.
ANNUAL INSPECTION:
  • Perform a comprehensive overhaul of the system.
  • Schedule a professional inspection and servicing.

SAFETY INSTRUCTIONS:

  • Before using the Machine, read the operating instructions carefully.
  • Must Operate by a Trained Personnel equipped with appropriate Personal Protective Equipment (PPE).
  • This Model is Suitable for certain Size of Rod and Tensile Strength. Do not ever try to cut Oversize Rod and Greater Tensile Strength.
  • Ensure the work piece is placed securely Between the Moving and Fixed Blade.
  • While the machine is not in use, keep the Hydraulic Power Pack switched off, so that accidental pressing of Switch cannot cause any injury.
  • Before the Operation make sure to keep hands and body clear of the Blades.
  • See that nobody is standing on the other end of the rod, because depending on the tensile strength of the material and flow rate of the power pack, the parted portion of the rod may shoot out at high speed causing injury.
  • Check that the Balancer and Hanging arrangement is strong enough to hold the combined weight of the cutter and the job.
  • During the Operation don’t open the Control panel.
  • Don’t let any untrained personnel open the control panel.
  • During the Operation Don’t let any Untrained and Unauthorized personnel near the machine.
  • Clean the area around the equipment to prevent any hazards.