Hydraulic Rod Cutter

Model No.: PSK-28

PPT Hydraulic Rod Cutter PSK-28 – 28 mm Capacity, Forged Alloy Steel, Heavy Duty Industrial Tool with Fixed & Moving Heat-Treated Blades.

Description

The PPT Hydraulic Rod Cutter PSK-28 is engineered for heavy-duty rod cutting in steel industries, combining strength, precision, and durability. Featuring a forged alloy steel heat-treated “C” frame, fixed and moving blades, and a double-acting design, it delivers up to 28,631 Kgf cutting force. Lightweight yet robust, it ensures accurate blade alignment, easy maintenance, and versatile hydraulic compatibility for industrial applications. This cutter is suitable to cut the the Front and Back end rings from the Wire Rod Coil at WRM and also for sample cutting for Q.C. Lab at WRM & Bar Mill.

Features:

  • Forged alloy steel heat treated “C” frame type cylinder body used.
  • Highly robust and durable design.
  • Double acting design.
  • Special quality sealing for specified pressure.
  • High wear resistant Moving Blade guide bushing for accurate Blade alignment.
  • Easy to operate & maintain.
  • Lighter in weight than Cast Steel design.
  • Unique design of Blades and special steel & Heat Treatment Process used for longer life.
  • Single piece ram & piston design for easy maintenance.
  • Suitable tool hanger fitted to positioning the tool at any angle for easy to operate.

Specification:

Model No. Weight Length Width Height
lb. kg inch mm inch mm inch mm
PSK-28 49 22.5 (Approx.) 16.14 410 4.88 124 9.53 242

Model No. Cutting Capacity (mm) Piston Stroke (mm) Operating Pressure (Bar) Cutting force generated by cutter kgf @450bar × 3.7lpm
PSK-28 Ø 28.0 28 450 28631
Index No. Part Number Part Name Quantity
1 HRCPK2801F BODY 1
2 HRCPK2802B BOLT FOR FIXED BLADE 1
3 HRCPK2803F FIXED BLADE WEDGE 1
4 HRCPK2804F FIXED BLADE 1
5 HRCPK2805B ‘O’ RING FOR BODY 1
6 HRCPK2806F BUSH 1
7 HRCPK2807B ROD SEAL FOR BODY 1
8 HRCPK2808F MOVING BLADE 1
9 HRCPK2809F MOVING BLADE WEDGE 1
10 HRCPK2810B BOLT FOR MOVING BLADE 1
11 HRCPK2811F PISTON 1
12 HRCPK2812B ‘O’ RING FOR PISTON 1
13 HRCPK2813B U-CUP SEAL FOR PISTON 1
14 HRCPK2814F CYLINDER 1
15 HRCPK2815F HANGING RING 1
16 HRCPK2816F LOCK NUT FOR BODY & CYLINDER 1
17 HRCPK0C17F VALVE 1
18 HRCPK0C18B VALVE PIN-1 1
19 HRCPK0C19B VALVE PIN-2 1
20 HRCPK0C20B ‘O’ RING FOR VALVE 1
21 HRCPK0C21B WASHER FOR VALVE 1
22 HRCPK0C22B SPRING FOR VALVE 1
23 HRCPK0C23F HANDLE 1
24 HRCPK0C24B PIN FOR HANDLE & TRIGGER 1
25 HRCPK0C25F TRIGGER 1
26 HRCPK0C26B BOLTS FOR HANDLE LOCATING 3
27 HRCPK0C27B ADAPTER FOR HYDRAULIC NIPPLE 2
28 HRCPK0C28B WASHER FOR LOCKING BOLT 1
29 HRCPK0C29B HYDRAULIC LOCKING BOLT 1
30 HRCPK0C30B GRUB SCREW FOR BUSH LOCKING 1
31 HRCPK0C31B BOLT FOR HANGING RING 3

OPERATIONAL MANUAL:

  • Connect the Starter with the power supply.
  • Switch on the Starter.
  • Place the Rod Securely between the Moving and Fixed Blade and make sure the Rod is aligning with the Cutting edge of the Blades and Ensure that the Full Diameter of rod is within the height of the Blades.
  • Press the Hand lever fitted with the cutter handle to cut the Rod and release the Hand lever once the retraction of the Moving Blade. After retraction of the moving Blade the machine is ready for the next cut.

MAINTENANCE:

DAILY INSPECTION:
  • Perform a daily visual inspection for any signs of wear, damage, or leaks.
  • Examine hydraulic hoses and connections for any wear or damage.
  • Check and tighten all bolts and fasteners.
  • Lubricate all moving parts before operating the machine.
  • Clean travel area of the Moving Blade.
WEEKLY INSPECTION:
  • Inspect for any hydraulic fluid leaks.
  • Clean the machine to prevent dust and debris build-up.
MONTHLY INSPECTION:
  • Inspect critical components for signs of wear and replace if necessary.
  • Maintain a log of all maintenance activities.
  • Check the Oil Levels.
QUARTERLY INSPECTION:
  • Conduct a thorough inspection of the entire system.
  • Replace any worn-out components.
  • Clean the Strainers fitted With the Pump.
ANNUAL INSPECTION:
  • Perform a comprehensive overhaul of the system.
  • Schedule a professional inspection and servicing.

SAFETY INSTRUCTIONS:

  • Before using the Machine, read the operating instructions carefully.
  • Must Operated by a Trained Personnel equipped with appropriate Personal Protective Equipment (PPE).
  • This Model is Suitable for certain Size of Rod and Tensile Strength. Do not ever try to cut Oversize Rod and Greater Tensile Strength.
  • Ensure the work piece is placed securely Between the Moving and Fixed Blade.
  • While the machine is not in use, keep the Hydraulic Power Pack switched off, so that accidental pressing of Hand lever cannot cause any injury.
  • Before the Operation make sure to keep hands and body clear of the Blades.
  • See that nobody is standing on the other end of the rod, because depending on the tensile strength of the material and flow rate of the power pack, the parted portion of the rod may shoot out at high speed causing injury.
  • Check that the Balancer and Hanging arrangement is strong enough to hold the combined weight of the cutter and the job.
  • During the Operation Don’t let any Untrained and Unauthorized personnel near the machine.
  • Clean the area around the equipment to prevent any hazards.