Hydraulic Rod Cutter

Model No.: HRC-20HV

PPT Hydraulic Rod Cutter HRC-20HV – 20 mm Capacity with Industrial Grade V-Blade.

Description

The PPT Hydraulic Rod Cutter HRC-20HV is built for heavy-duty steel industry applications, offering precision, durability, and easy maintenance. Featuring a forged alloy steel heat-treated “C” frame, single acting spring return design, and high wear-resistant blade guide, it delivers up to 22,092 Kgf cutting force. Lightweight yet powerful, it supports bunch cutting operations and ensures long service life. This cutter is suitable to cut the the Front and Back end rings from the Wire Rod Coil at WRM and also for sample cutting for Q.C. Lab at WRM & Bar Mill.

Features:

  • Forged alloy steel heat treated “C” frame type cylinder body used.
  • Single return spring design.
  • Special quality sealing for specified pressure.
  • High wear resistant Moving Blade guide square bushing for accurate Blade alignment.
  • Easy to operate & maintain.
  • Lighter in weight than Cast Steel design.
  • Unique design of Blade and special steel & Heat Treatment process used for longer life.
  • Wide range of Hydraulic Power Pack used for different application of the user requirement.
  • Single piece ram & piston design for easy maintenance.
  • Suitable tool hanger fitted to positioning the tool at any angle for easy to operate.
  • Suitable for Bunch Cutting operation.

Specification:

Model No. Weight Length Width Height
lb. kg inch mm inch mm inch mm
HRC-20HV 39.6 18.0 15.74 400 4.9 125 6.1 155

Model No. Dia. capacity (mm) Tensile strength (kg/mm²) Shear Strength (kg/mm²) Cutting Force reqd. (kgf) Cutting force generated by cutter kgf @500bar × 3.7lpm
HRC-20HV 20mm 90 58.5 18381 22092
18mm 110 71.5 18197
16mm 110 81.25 16338

Note:

  • Considering shear strength to be 65% of tensile strength.
  • If you send us the specification (Tensile strength and diameter of Bar) we shall recommend the right cutter for your application.
INDEX PART NUMBER PART NAME QTY.
1 HRCWC0001F LONG NIPPLE 1
2 HRC20HV02F CYLINDER 1
3 HRC20HV03F ROD CUTTER BODY 1
4 HRC20HV04F PISTON 1
5 HRCWC0005B HEX. SOCKET 1
6 HRC20HC06B U-CUP SEAL 1
7 HRC20HC07B BEARING SEAT 1
8 HRC20HC08B C-PIN 1
8A HRC20HC8AB C-PIN 1
9 HRCWC0009F CONNECTOR 1
10 HRC20HV10F MOVING BLADE 1
11 HRC20C011F BUSH 1
12 HRC20C012B GRUB SCREW 2
13 HRC20HV13F FIXED BLADE 1
14 HRC20HV14B BOLT FOR FIXED BLADE 1
15 HRC20HV15F FIXED BLADE SUPPORT 1
16 HRC20HV16F UPPER COVER FOR FIXED BLADE 1
17 HRC20HC17B BOLTS FOR UPPER COVER 4
18 HRC20HV18B SPRING 1
19 HRCWC0019F HANDLE 1
20 HRCWC0020B GRUB SCREW FOR HANDLE 2
21 HRC20HC21B BOLT FOR HANGING RING LOCATING 2
22 HRC20HV22F HANGING RING 1
23 HRC20HC23B HANGING RING BOLT 2

OPERATIONAL MANUAL:

  • Connect the control panel with the power supply.
  • Turn on the MCB located on the control panel.
  • Make sure the Red, Blue and Yellow Lights are turned on/ Glowing.
  • Switch on the motor and the solenoid from the control panel.
  • Place the Rod Securely between the Moving and Fixed Blade and make sure the Rod is aligning with the Cutting edge of the Blades and Ensure that the Full Diameter of rod is within the height of the Blades.
  • Operate the Hand/Foot Switch to cut the Rod Completely and wait for the retraction of the Moving Blade. After retraction the machine is ready for the next cut.

MAINTENANCE:

DAILY INSPECTION:
  • Perform a daily visual inspection for any signs of wear, damage, or leaks.
  • Examine hydraulic hoses and connections for any wear or damage.
  • Check and tighten all bolts and fasteners.
  • Lubricate all moving parts before operating the machine.
  • Clean travel area of the Moving Blade.
WEEKLY INSPECTION:
  • Inspect for any hydraulic fluid leaks.
  • Clean the machine to prevent dust and debris build-up.
MONTHLY INSPECTION:
  • Inspect critical components for signs of wear and replace if necessary.
  • Maintain a log of all maintenance activities.
  • Check the Oil Levels.
QUARTERLY INSPECTION:
  • Conduct a thorough inspection of the entire system.
  • Replace any worn-out components.
  • Clean the Strainers fitted with the Pump.
ANNUAL INSPECTION:
  • Perform a comprehensive overhaul of the system.
  • Schedule a professional inspection and servicing.

SAFETY INSTRUCTIONS:

  • Before using the machine, read the operating instructions carefully.
  • Must Operate by a Trained Personnel equipped with appropriate Personal Protective Equipment (PPE).
  • This Model is Suitable for certain Size of Rod and Tensile Strength. Do not ever try to cut Oversize Rod and Greater Tensile Strength.
  • Ensure the work piece is placed securely Between the Moving and Fixed Blade.
  • While the machine is not in use, keep the Hydraulic Power Pack switched off, so that accidental pressing of Switch cannot cause any injury.
  • Before the Operation make sure to keep hands and body clear of the Blades.
  • See that nobody is standing on the other end of the rod, because depending on the tensile strength of the material and flow rate of the power pack, the parted portion of the rod may shoot out at high speed causing injury.
  • Check that the Balancer and Hanging arrangement is strong enough to hold the combined weight of the cutter and the job.
  • During the Operation don’t open the Control panel.
  • Don’t let any untrained personnel open the control panel.
  • During the Operation Don’t let any Untrained and Unauthorized personnel near the machine.
  • Clean the area around the equipment to prevent any hazards.